A thousand ways of seeing

My research question looks at what decolonising or non-Western ways of seeing within fine art mean, ways to achieve it and how to implement them in our teaching practice.  The purpose of the project is to investigate ways to broaden the fine art curriculum to make it more inclusive. 

The research questions guiding the project are: what does decolonising ways of seeing / a non-Western approach within fine art mean? What are the ways to achieve it? How can we as teaching staff implement them in our teaching practices? What would incorporating them in a regular club/seminar look like? 

I teach on BA Fine Art at Chelsea College of Art. The cohort is large, around 160-80 per year group. I teach on year 3 and the course is organised into two units. A writing unit titled Thinking, Making, Writing, a wholisticaly assessed unit which comprises, an exhibition, a reflective report and a 6-8000 word essay or a shorter essay of 3-4000 word and a 15 min presentation. The second unit is titled Making Public, i.e. their interim and degree show.

Posted in ARP | Leave a comment

ARP Reflections and what’s next

  • Unexpectedly the term decolonise caused quite a bit of stir in the respondents, perhaps using “broadening ways of seeing” or using the term “non-Western” in the research question will bring the focus a bit more on the topic. 
  • There are some practical suggestions such as reading groups and workshops with grass root organisations, but because so much of the teaching is 1 to 1 and small group, it really relies on the tutor to change internally and externally in order to effect change and for the change to be apparent. 
  • However, as a student suggested in their response, the curriculum is very much geared towards the western framework, there is a need to think about it at course revalidation. This has definitely motivated me to take an active role in changing the course structure. 
  • One of the suggestions that really made an impression is the sculpture seminars that my colleague runs, how she introduces the canonical texts but invite students to question and take this apart. This has prompted me to think about ways of designing my seminars, and also has made me work hard in undoing and unlearning what I have learned at Chelsea. 
  • As a next step, I want to liaise with colleagues in fine art across UAL to join forces in understanding how other courses are doing on this effort. 
Posted in ARP | Leave a comment

Presentations

Final Presentation slides

Posted in ARP | Leave a comment

References

Abdulla, D., Cisneros, T., Francke, A., et, al. (2020) Decolonizing: The Curriculum, the Museum and the Mind, Vilnius: Vilnius Academy of Arts Press 

Akussah, A., Hanskika, J., Panesar, L., Patel, R., 2018, Decolonising the Arts Curriculum: Perspectives on Higher Education, Zine 1 & 2, London: University of the Arts London. Available at. https://decolonisingtheartscurriculum.myblog.arts.ac.uk/ 

Bhabha, H. (1994) “Of Mimicry and Man: The Ambivalence of Colonial Discourse” in: Bhabha, H. The Location of Culture. (London: Routledge) 

Bhambra, G.K., Gebrial, D., Nişancıoğlu, K. (ed.), (2018), Decolonising the University, London: Pluto Books  

Bourdieu, P. (1984) Distinction: a social critique of the judgement of taste, London, Routledge  

Burke, P.J. and McManus, J. (2011) ‘Art for a few: exclusions and misrecognitions in higher education admissions practices’ in Discourse: Studies in the Cultural Politics of Education, 32 (5). pp. 699-712  

Freire, P. & Ramos, M.B., (1968) Pedagogy of the Oppressed, London: Penguin Books 

Hall, S. (1992) ‘The West and the Rest: Discourse and Power.’ In S. Hall & B. Gieben (Eds.), Formations of Modernity (pp. 275-320) Lonson: Polity Press.  

Hall, S. (1997) Representation: Cultural Representations and Signifying Practices. CA: Sage.  

hooks, b. (1994) Teaching to Transgress. Education as the Practice of Freedom, London: Routledge 

Hylton, R., (2019), ‘Decolonising the curriculum’ in Art Monthly, 426, May 2019. Available at https://www.artmonthly.co.uk/magazine/site/article/decolonising-the-curriculum-by-richard-hylton-may-2019 

Law, W.S. (2009) Collaborative Colonial Power – The Making of the Hong Kong Chinese, Hong Kong: Hong Kong University Press 

Mignolo, W.D. (2009) ‘Epistemic Disobedience Independent Thought and Decolonial Freedom’ in Theory, Cutlure & Society, 26: 7-8, 2009, pp. 159-181  

Mignolo, W.D. (2011), The Darker Side of Western Modernity: Global Futures, Decolonial Options, Durham: Duke University Press  

NUS (2011) Liberation, Equality, and Diversity in the Curriculum, [Online] London:NUS. Available at: https://www.sparqs.ac.uk/upfiles/Liberating%20the%20curriculum.pdf

Sim, J; Waterfield, J, 2019 ‘Focus group methodology: some ethical challenges’, Quality & Quantity.Available at https://keele-repository.worktribe.com/output/413994 

Thiong’o, N. (1986) Decolonizing the Mind: The Politics of Language in African Literature  

UAL (2003) UAL Decolonising Arts Institute. Available here: https://www.arts.ac.uk/ual-decolonising-arts-institute

UAL Communications (2021) Publishing our Anti-racism action plan and a demanding target for Black, Asian and minority ethnic staff representation. Available at https://www.arts.ac.uk/about-ual/press-office/stories/Publishing-our-Anti-racism-action-plan-and-a-demanding-target-for-BAME-staff-representation

UAL Dashboards (2023) Attainment gaps for all Fine Art courses in UAL, 2020-22, UAL Data Dashboards. Available at http://dashboards.arts.ac.uk

Posted in ARP | Leave a comment

Rationale

As a student and now a lecturer from the Far East, I personally experienced the
challenges of navigating my own heritage in a fine art curriculum that is
predominantly rooted in Western art history and aesthetics. This experience has
made me acutely aware of the need for greater cross-cultural representation and
diversity in the arts and led me to pursue an academic intervention aimed at
decolonizing the arts curriculum.


During my time as a BA fine art student at Chelsea College of Art, I happily and
willingly absorbed the history, knowledge and perspectives that were on offer which
were great, and I learned tremendously. An unintended result was that they framed
what for me was “good” or “legitimate” way of making and thinking about art. When
I left the BA course and progressed further into my fine art studies, I began to
question where my own heritage and cultural experience stand in the arts. I realized
that I have repressed my origin and heritage to please the system I was in by mimicry
(Bhabha, 1994). This was a result of internalized racism, a result of the post-colonial
condition I was brought up with in Hong Kong (Law, 2009).


While BA Fine Art course at Cheslea is changing and has been embracing diversity,
inclusion and decolonization as part of its teaching ethos, which manifested in
changing the way theory is taught, including more non-Western artist examples and
employing Black, Asian, Minority Ethinic (B.A.M.E) staff. This approach did not go far enough to challenge the production of knowledge. I am interested in changing perspectives on contemporary art and practices.


With this in mind, I hope that my project echoes the ethos of the Decolonising
the Arts Institute (UAL, 2023) which is “to challenge colonial and imperial legacies,
disrupting ways of seeing, listening, thinking and making to drive cultural, social and
institutional change”. This is important because it endorses equity, both in
attainment and in cultural power. Within UAL in the last four years, we see a consistent gap between home white students and home Black, Asian, Minority Ethnic students. (see chart 1). The gap is more stark between home white and home black students. The gap exists as well between home and international studetns (UAL Dashboards, 2023). The data
alone by no means indicates that this is due to a lack of broad perspectives on the
course. However, anecdotally, from my personal experience as an assessor for
degree shows, B.A.M.E students whose work and diversity of references “look”
different from the canon were marked down. The reason being that the student
didn’t reference any artist or theorist, i.e. references that are part of the milieu
familiar to the tutor.

Chart 1: BA/BSc attainment across all Art and Design programmes
Chart 2: BA/BSc attainment across all Art and Design programmes
Chart 3: BA/BSc attainment across all Art and Design programmes


To truly liberate the arts curriculum and to redistribute cultural power, it’s not just
about changing the reading lists or the creation of more lists. It is also about
changing the way course content is delivered and assessed, and the environment in
which students are expected to learn. (NUS 2011) It is about dismantling the
hierarchy of knowledge – of what is valuable and legitimate discourse, context and
what is not, of what could look like contemporary art and what does not. As
discussed in Burke and McManus’s Art for a Few (2009), it Is important to consider
which art is privileged and which type of art is encouraged and dismissed. They
quoted Bourdieu in asserting that art is implicated in the reproduction of
inequalities, and that the relationship between culture and power is such that taste
creates social differences. Certain kinds of art can be decoded and appreciated by
those who have been taught how to decode them (Bourdieu 1984). The cultural
capital of the working classes, and certain ethnic groups are, as a result,
compromised.

In my teaching context, non-Western discourses are compromised in
favour of the dominant Western discourses. This view is also supported by Stuart
Hall, who argued how the West has constructed the “Other” as inferior through
cultural representation to justify domination over non-Western cultures (1992) and
that cultural representations are always embedded in power relations and can be
used to reinforce or challenge dominant ideologies (1997).


As such, I hope that the project can shed light in practical terms in my teaching practice how can can decolonise not just the curriculum but our thinking habits and the dominant narratives that have ingrained our minds through our education.

Posted in ARP | Leave a comment

Action plan

Gantt Chart I made at the end of November when finalising the research question
Action research cycle at the start of the project c. November
Posted in ARP | Leave a comment

Participant Facing Documents

Information Sheet

Consent Form

The consent form and information sheet I followed quite closely to the sample forms on Moodle, hence there was little amendments made. I made sure the research questions and rationale are provided in the information sheet.

Posted in ARP | Leave a comment

Ethics

After two iterations of corrections, this is the final version of the Ethics form. There have been major corrections to arrive at this third version. A significant change is on the research methods. I was previously unware of the ethics of using focus groups. I assumed this mode would be the easiest to conduct. However, after being introduced to the article by Sim and Waterfield (2019) on the ethical challenges, I decided to switch to questionnaire and interview format. Please see the reflection blog post for further info.

The other major changes include evaluation of risks. My tutor Rachel pointed out that there are potentially more risks to myself as a researcher and to my participants, including the potential to have their identities identified through the content as well as researcher wellbeing.

Selection criteria was another area where I was prompted to think harder and to give more explanations as to the rationale of them as well as data management safety, and ethics of disclosure.

Posted in ARP | Leave a comment

Research Methods

Primary research

I have used a combination of interview and questionnaire. I have chosen to interview five member of staff and to send a questionnaire to five students (both alumni and current students), out of whom three responded.

In pinning down research methods, I have chosen to use one to one interviews for staff and interview like questionnaires for students. Please see my reflection post for further info on the decision.

Interview Schedule for staff

The feedback I received was that there is quite a large number of questions which can be grouped into three main groups – understanding of decolonising ways of seeing, the Chelsea Fine Art teaching context and suggestions for seminars/club that serve this purpose. However, they are also comprehensive and give a good understanding of the contexts from which the questions are raised. So I kept them but also indicate in the interview that they may talk around them.

Questionnaire for students

The questions for students follow the same vein that of the staff but focussed more on their learning experience. I have also allowed for leeway for incomprehension. It’s okay if they cannot answer or do not understand a question.

The below are summary of data analysis and one example of the transcripts as well as responses from questionnaire. All of which have been anonymised to scrubbed to ensure that identity cannot be traced back.

Primary data analysis – summary

Interview transcript with staff member 1

Questionnaire responses from students

Data Analysis Methods

For primary research data analysis, I have chosen content and narrative analysis as my analytical tools. This is because each interview is different and requires drawing out specific insights. It is time consuming but it’s the best way to obtain and not miss any valuable data. Each interview is also indicative of the interviewee’s personal background, education, age, political leanings, so each will have a slightly different approach to the questions. Since the data output is limited, there is less scope for thematic analysis.

Secondary Research

For Secondary research, I used primarily journal articles and books to increase my knowledge. The UAL Decolonising Arts Institutes produced a number of zines which were also very good resource. I have included the findings under project findings and in the reference doc.

Posted in ARP | Leave a comment

Project findings

note to reader: I have adopted an essay form of approach to summarise and evaluate my project findings as I find this method best capture the qualitative data I collected from both primary and secondary sources and be used to build an argument. Contrary to the presentation, I focus here on the literature first in order to set the scene first before diving into findings from primary research.

Secondary research – Literature review

Literature on the topic of decolonisation is abundant. The Argentinian professor Mignolo argues for epistemological disobedience, which is that de-colonial thinking presupposes de-linking (epistemically and politically) from the web of imperial knowledge and from disciplinary management, putting humanity and human lives first before larger abstract concepts. For example, instead of asking how we can save capitalism in light of a financial crisis, we ask instead how human lives can be saved or conditions be improved. He proposes decolonial options such as cultural diversity and stressing indigenous knowledge (Mignolo 2011) From a broader perspective, in Decolonizing the Mind: The Politics of Language in African Literature, the Kenyan author Ngũgĩ wa Thiong’o critiques the colonizing effect of the language of English and French, and call for abandoning English colonial names and the adoption of indigenous language for writers and scholars. 

Problems of colonial mindsets pervade the university, which in itself is colonial product. In the book, Decolonising the University, sociologist William Jamal Richardson argues that Eurocentrism in the discipline of sociology allows for intrinsically racist and colonial theory and findings to be developed and disseminated within academe and among the public. He argues that the sum total of these processes is that in many spaces sociology, like the social sciences more generally, perpetuates systems of inequality and the social logics that justify them. Unfortunately, these processes are repeated across disciplines. In the same book, Azumah Dennis’s chapter ‘Decolonising Education: A Pedagogic Intervention’ in the book , explores what it might mean to decolonise education. Dennis proposes a decolonised educational project places counter-hegemonic curricula and pedagogy at its core, by recognising different forms of understanding, knowing, experiencing and explaining the world. Through an Ubuntu pedagogy, Dennis offers an alternative way of thinking about and being in the world, which challenges the hegemony and universality of capitalism and the Western logic of “civilisation”.   

These alternatives are also explored in Paolo Freire’s The Pedagogy of the Oppressed (1968) and bell hook’s Teaching to Transgress (1994). Freire advocates critical pedagogy, which advocates the importance of non-hierarchical dialogue to develop critical consciousness in students. The student and teacher learn together to generate new knowledge. bell hooks speaks about building community within the classroom to foster a climate of openness and intellectual rigor, and to build a community in a classroom is to recognize the value of each voice. A decolonised pedagogy framework emphasizes on the learner to create a new framework to negotiate concepts such as knowledge and intelligence that is both critical and action oriented towards social change and political action.  

Homing in on literature on decolonisation in arts and design, similar conversation could be found. UAL staff member Jo Shah argued that one way to decolonise arts and design higher education curriculum is “by opening up critical conversations and contexts that look beyond a limited Eurocentric lens to consider global art and design” and that there is a “need to broaden knowledge base and contexts to exceed Eurocentrism” (2018, p.16). Similar arguments and problems are found in contributions by Dr. Gurham Signh, Visiting Fellow of Race and Education (2018, p.1), and other student and staff members such as Joel Simpson (2018, p.18) and M.F., (2018, p. 7). However, the curriculum is only one piece of the puzzle in the process of declonising higher education. Richard Hylton in Art Monthly (2019) argues that despite efforts in the museum and art history courses to include black and minority artists, the academy itself is still reluctant to employ black and minority staff. He cited a statistic from the Guardian that in 2011, it was reported that 50 out of 14,000 British professors were black, while in 2016/17, 25 black women and 90 black men could be counted among 19,000 professors. This goes to show that decolonising the curriculum is not the full picture. 

If one looks at UAL’s statistics, one can learn of the relevance of the call for decolonising the university. Consistently, there is a performance attainment gap between home and international students and between white and Black, Asian and Minority Ethnic (BAME) students (see chart 3 in the rationale section), a colonial mindset in higher education structures as evidenced by predatory development strategy, and under-recruitment of staff and students of colour. Overall UAL’s Black, Asian and minority ethnic staff population is currently 23.13%. This is lower than HEIs in London (27.9% of all staff) (UAL Communications 2021). This is to bear in mind that the ratio in professional services staff will skew the data as the ratio of academic staff is likely lower that 23%.

In the literature reviewed, there is ample evidence and cogent arguments for the need to decolonise the curriculum. However, most of the discussions have been to diversify knowledge base and contexts to exceed Eurocentrism. There are still questions to be asked. Such as: What are the concrete strategies that can be incorporated into our teaching practice? What are we teaching? How’s it being taught? Under what conditions, and via what assumptions is it being taught? How can we in practice broaden ways of seeing within the BA Fine Art course at Chelsea College of Art? 

Primary Research – Interviews and questionnaire for Chelsea staff and students

These are the questions I’d like my ARP to shed some light on. The secondary research I have done answered some of the personal questions I have around decolonisation vs de-westernisation of the curriculum. In many instances, decolonisation is to de-Europeanize art history, the curriculum and to shift away from the European canon, so is the intention of the questions of the interview and the questionnaire.  

I am hoping to gain an insight on the ground from staff as well as students what their perspectives are on how Chelsea is doing on this front and how we can do better.  

The results of my primary research confirmed the discussions in the literature surveyed. The personal insights and experiences of staff and students added invaluably to the research findings. They highlighted specific problems within Chelsea and some practical suggestions to improve. 

On the understanding of what decolonising ways of seeing or non-western ways of seeing. It was agreed upon that for those educated in the power centers of art, decentering yourself from your own education and experience and to constantly requestioning your position and what can be called research, as well as have respect for other means of artistic expression and cultural production. embrace diverse narratives beyond the traditional Western canon.  

Interestingly, a student’s experience suggests that there is a colonial mindset within the Western position on inclusivity and diversity.  

Student 1: “as a black woman who makes art. In my first year of art education I always felt pushed to make art with things specifically pertaining to my race. I found this unusual, unspoken assumption that black artists can not be just ‘artists’ but must be ‘black artists’, who only make art that will cater to the usual conversation of what it means to be black. There is nothing wrong with this, until the expectation is only on making art based on race, and not being free to think outside ‘race’.” This is invaluable insight for those who care about diversity and inclusion to not repeat the colonial imposition of one’s expectation and idea of what one’s art should be.”

Her experience leads to a third important point of what broadening ways of seeing in the teaching practice means: Listening and empathy. Listening with care, not in a disabling way or to input what you know about it but listening with intent of understanding. This point echoes bell hooks’ idea of community building through listening to each voice.  

Passionate voices were heard during the interview process on decolonisation in the context of higher education. They criticized the use of the term decolonisation in relation to UAL’s own predatory and exploitative practices on student and staff recruitment, estate expansion and waste management. It was entirely understood that one finds it difficult to speak about decolonisation without addressing the elephant in the room.

There is also concern over decolonisation as a term being used as a vacuous rhetoric, an administrative box-ticking token gesture for liberals to promote diversity equality and inclusivity without real intention and sincerity behind. This is also a valid criticism. There have been major and highly visible campaigns within UAL such as the work done by Decolonising the Arts Institute and Shades of Noir, however, on the ground, the lack of impact is felt by the students. 

Student 1: “In art education, there should be space within art history and theory to introduce other cultures that existed concurrently and even impacted the development of Western art.”  

Student 2: “The university’s commitment to embracing diverse perspectives almost became propaganda through the promotion and inclusion of additional sign-up talks and resources, particularly during liberation months. However, the core curriculum itself exhibited a clear prioritisation of certain knowledge, and the staff lacked adequate exposure to perspectives beyond this dominant (Western) framework.” 

The concern by student 2 is echoed by a member of staff during our interview. They lamented the lack of knowledge and expertise they have on modes of cultural production and don’t want to put students in an awkward position or offending them by misrepresenting these other cultures.  

The data also showed that there is a consensus that, at Chelsea, conceptual and more cerebral type of art production is deemed more legitimate. This is partly a legacy of teaching the historical Western canon. From an interview, a member of staff admitted that there is a conundrum in the desire to embrace the intellectual tools inherited by the historical canon and to reject the canon at the same time.  

Staff member 1: “But there’s the present day. Kind of, I suppose, center, I suppose which has a lot to do with criticality, which I don’t disagree with. I mean I think criticality is absolutely fundamental, but I think that it also alienates people because our mode of criticality, I suppose, has its norms and its expectation and inherited from the canon.” 

This has been a problem at Chelsea. On the one hand, students are enocuraged to be “critical” with their art practices and this “criticality” is inherited from and understood in relation the historical western canon. In a way, to make legitimate art at Chelsea one needs to embrace the canon. What is the solution? 

One member of staff offers invaluable insight into this. To subvert Audre Lorde’s famous saying, we bring in the masters’ tool to dismantle the master’s house. It is to bring in concepts that are from the canon and from the power centre, go within in, redefine and reshape it to make it your own. On the point of criticality and historical canon, we bring in the intellectual tools inherited from the canon but get rid of the canon. Like this we make the concept of art moldable and anything can be incorporated into art and as art. They gave an example of running a seminar on a text by the canonical Hal Foster from the October Magazine but making the students understand what the power the magazine has, at the same time discussing and dissecting the core ideas from the texts, and encourage the students to tear them apart and redefine them as their own. 

Staff member 2: “Giving every student the tools like dismantle concepts and institutions and sort of like in a way that’s the goal, isn’t it, to make sure each student can turn its back and refuse art college and university.”  

Another invaluable insight from another member of staff is that, there is not necessarily a need to have a seminar series on marginalised voices as marginalised voices many of whom they do not want to be marked as marginalised. Instead, the series can be about the mainstream and the canon but to make sure we incorporate different voices that can change, affect, and move it forward not for the good of the mainstream but for the good of those who aren’t in the mainstream.  

Staff member 3: “to borrow Angela Davis, it’s not about being at the centre, but knowing that your voices at the margins have been fought for, you are in flocks around the centre, constantly developing and evolving, so the seminars could be seminars that focus on talk about the mainstream and how those different voices included can change, can affect, can move it forward not for the good of the mainstream but for the good of those who aren’t in the mainstream.” 

There are other good suggestions for seminars ideas from the research include involving grass-root level organisations to run student projects and with which to build a horizontal network; introducing insurgency in mode of delivery, thus encouraging disruption of codified/stable powers in formats and concepts; as well as reading group on art writing and texts from non-Western artists and writers. These are all ideas which need to be taken forward for thorough exploration.

Conclusion

Both primary and secondary sources point to the need and urgency to decolonise, de-westernise and broaden our curriculum to make it fairer and more inclusive. The aim of the project is to explore ways to integrate strategies into my teaching practice and in particular, how this would look like in an informal seminar series. What I have found is that whilst there is a consensus amongst staff and students that it is imperative to look beyond Western narratives and make each voice heard, it is not necessary to disregard it completely. Broadening ways of seeing can mean going inside the Western historical canon to dissect, dismantle, redefine and create new meanings and knowledges to change and affect for the good of those underrepresented. Broadening ways of seeing is linked to changing modes of thinking and operating – not to be fixated on representation but to constantly question and challenge centres of power and fixed modes of thinking, to be equipped with the confidence and the tools to dismantle the master’s house and rebuild houses for those previously encaged. To quote Wilfredo Lam, a black Cuban abstract painter, “My painting is an act of decolonisation”. This echoes with the student’s lament of how she was “expected” to make work about race, which has racist undercurrent. If we can free our minds to imagine the marginalised having a voice in the mainstream without it being an exception, that would be a significant first step to change.

Posted in ARP | Leave a comment